Surveys for GSI power cable awaiting survey clearance



A French research vessel is awaiting authorization to resume seabed surveys for an electricity cable linking Greece and Cyprus, as Turkish objections to a separate undersea cable project underscore the geopolitical challenges facing infrastructure development in the Εastern Mediterranean.



Source link

Leave a Comment