The so-called “intervention package” to be announced by Prime Minister Kyriakos Mitsotakis in his keynote economic policy speech at the Thessaloniki International Fair is expected to cost between €1.8 billion and €2 billion.
Source link
The so-called “intervention package” to be announced by Prime Minister Kyriakos Mitsotakis in his keynote economic policy speech at the Thessaloniki International Fair is expected to cost between €1.8 billion and €2 billion.
Source link