
[InTime News]
Athens metro operator STASY is carrying out a facelift on Line 1 (Piraeus-Kifissia) to reduce delays and repair problematic areas in the infrastructure, so that the journey becomes faster and more enjoyable.
“For the first time, we are carrying out maintenance on the track since the line was renovated between 2009-2010,” company sources say, speaking about the track maintenance project on line 1, with a budget of €4.9 million that STASY announced.
At the same time, the future of the Faliro-Piraeus section remains a big question, as the condition of the line has been problematic for years, with trains moving at very low speeds.